• ESC's Initial Cleanroom Design meetings include the customer and CAD projected on a whiteboard for brainstorming concepts.
  • Product and Personnel Flow
  • Ceiling (Lighting, Filtration and HVAC system) Layouts
  • Careful 2D and 3D design considerations lead to successfully budgeted and constructed projects.
  • A facade can be used to hide unsightly duct work, etc, above the Cleanroom.
  • Air Change & Pressurization Calculations
  • Exhaust System Options
  • Temperature / Humidity Controls Options
  • Process Connections
Pause

Design

As a partner in your project, we offer our experience to your team to fully understand the project requirements and budget, and offer solutions to best fulfill your requirements.

With our experience across multiple industries, we can assist with the multitude of decisions that are required to turn over a successful project.

We can assist with one component, or a complete turn-key solution as required.