• Step 1: Cleanroom construction zones should be prepped accordingly.
  • Step 2: Hang the ceiling grid.
  • Step 3: Apply the new flooring (if required).
  • Lasers are used to ensure exact measurements on wall positioning.
  • Step 4: Protect the new floor and put down the floor track.
  • Install Wall Studs
  • Install Window Frames
  • Install Wall Panels
Pause

Construction

A Cleanroom is only as good as the quality of the installation.  ESC offers a few installation options:

  • An ESC Installation team can complete the full installation
  • ESC can provide a professional Cleanroom Construction Supervisor to guide your local trades
  • ESC can provide a ‘Cleanroom–In-A-Box’ with all of the labeled components and detailed video instruction on an iPad for the complete assembly.
  • How about Deconstruction for shipment and reassembly at another site?  We do that too!

Materials are organized and cut to size in our factory prior to shipment to site to maximize our efficiency and to minimize any interruptions to our customers.