TF: 1.844.ESC(372).8877

Cleanroom Electrical Weatherproof Cover
Cleanroom Electrical Weatherproof Cover
Cleanroom Lighting
Cleanroom Lighting
Cleanroom Electrical Weatherproof Cover
Cleanroom Electrical Weatherproof Cover
Cleanroom Electrical Weatherproof Cover
Cleanroom Electrical Weatherproof Cover
Wash Down Receptacle Cover
Wash Down Receptacle Cover
Cleanroom Sealed Electrical Box
Cleanroom Sealed Electrical Box
Cleanroom Electrical
Cleanroom Electrical

Electrical

The selection of the best methods or systems for electrical systems required for your Cleanroom, can vary with the requirements:

We can help you understand the various systems available, and choose the best solution for your project.

Electrical Distribution

Electrical Systems are divided into 600/480 3 Phase higher Voltage systems, for Process and HVAC and Air Handling Systems.

120/208 Single and 3 Phase Power is supplied by a transformer from the higher voltage system, and is distributed by breaker panels. On smaller Cleanrooms we recommend that these be installed in your Change room.

Cleanroom Main Electrical Service
Cleanroom Main Electrical Service


Cleanroom LED Tear Drop Lighting
Cleanroom LED Tear Drop Lighting
Cleanroom LED Tear Drop Lighting
Cleanroom LED Tear Drop Lighting

Cleanroom Seled Pharmaceutical Light T5 Lamps
Cleanroom Seled Pharmaceutical Light T5 Lamps

Lighting

Lighting is designed to provide an illumination level based on the use of the space.

Typical lighting levels in Foot Candles are:

Cleanrooms & Support Areas – 65

Office Areas – 55

Storage Rooms, Central Plant, Exit Corridors & Mechanical/Electrical Support Areas – 35

Exit lights are required by the building code to assist in personnel in finding their way out of the Cleanroom, in case of an emergency exit requirement. These fixtures require illumination in a power outage, and may include emergency lighting.

Generator / UPS

Some Process requirements may require the installation of a Generator to provide power in the case of a disruption, & / Or an Uninterruptible Power Supply (UPS) if the requirement is for no delay.


Cleanroom / BSL Natural Gas Generator 250 Amp
Cleanroom / BSL Natural Gas Generator 250 Amp
Cleanroom / BSL Facility UPS 200 Amp
Cleanroom / BSL Facility UPS 200 Amp


Copyright © 2015 ESC. All rights reserved.